HUGH FLEMING DENTISTRY, MOSMAN

DENTAL SURGERY FITOUT

PROJECT SCOPE

The design, installation and commissioning of a comfortable, silent and efficient air conditioning system suitable for a high end installation.

 

PROCESS

A ducted, fully variable system supplied by Sygnal was installed to serve the main circulation, waiting and administration areas.

A Mitsubishi electric city multi VRF system was installed to condition the surgeries.

 

OUTCOMES

  • An energy efficient system, comprising the latest technologies
  • Thermal zoning, ensuring that the client is only conditioning the spaces that required conditioning
  • Complete control of each room/zone via the sophisticated control programs inherent to each of the air conditioning systems
  • WIFI interface with remote service access to the air conditioning systems.